๐Ÿ’ง 220 CRORE LITRES! THAT'S THE SCALE OF DHOLERA'S NEW WATER INFRASTRUCTURE PROJECT.

A major infrastructure development is planned for Dholera SIR.

๐Ÿ“Œ Project Investment: โ‚น438.74 Crore

๐Ÿ“Œ Water Storage Capacity: 220 Crore Litres

๐Ÿ“Œ Construction Target: 18 Months


The project will include a reservoir, pumping station, pipeline network and modern SCADA-based monitoring systems.

Read More: https://www.dholeraprime.com/dholera-sir-220-crore-litres-water-reservoir-project/

๐Ÿ’ง 220 CRORE LITRES! THAT'S THE SCALE OF DHOLERA'S NEW WATER INFRASTRUCTURE PROJECT.A major infrastructure development is planned for Dholera SIR.๐Ÿ“Œ Project Investment: โ‚น438.74 Crore๐Ÿ“Œ Water Storage Capacity: 220 Crore Litres๐Ÿ“Œ Construction Target: 18 MonthsThe project will include a reservoir, pumping station, pipeline network and modern SCADA-based monitoring systems.Read More: https://www.dholeraprime.com/dholera-sir-220-crore-litres-water-reservoir-project/
0 Comments 0 Shares 7 Views 0 Reviews
AC Mingle https://acmingle.com